39th Construction day

What has been done today?

The tilers EC appear to have moved all the floor tiles. Apparently because we came into the house only with a balancing act - you could not connect to the tiles.


was also probably the hole (because of household connections) closed in the equipment room. Hopefully was also given to the hats, unfortunately redundant conduits outside and close to an expert. I'm curious.

the bathroom above the area was prepared for the bathtub to the "tiling". One can imagine all right, as it will appear soon, if everything is ready. Furthermore, the tiles of the shower area was coated with such a gray / brown plaster. "Denture adhesive? ;-)))


Electrical : We do not seem to be with our odyssey at the end. We heard this as our EHZ (meter) is or was. If this is true, which I told the friendly lady at evd, I'll wild. But I'm waiting times from the opinion of our BL, before I really get upset.

we have today with our insulation for the loft ordered. They want us on Saturday on their own performance - yes you read that right - block. It will be a clamping felt from Isover (somehow a worse name, I think) to 180mm in thickness called "Integra ZKF 1-035. But we actually our loft "only" want to protect something of violent peak temperatures, the material is possibly too good, but we got favorable turn.