Exchange-order.info
Exchange-order is ranked > 3,000,000 in the United States. 'Ford Mustang Sale Brochure - www.exchange-order.info.'
--Rank in United States
--Worldwide Rank
Monthly pages viewed | < 300 | |
Monthly visits | < 300 | |
Value per visitor | -- | |
Estimated worth | $711.94 | |
External links | -- | |
Number of pages | -- |
Last Updated: 04/15/2018 . Estimated data, read disclaimer.
www.Exchange-order.info
Links- Links out
- admere.com Advanced Medical Reviews | Delivering Independent Medical Reviews
- nativerank.com Local and National | Search Engine Optimization SEO & Internet
- moldingbox.com Warehouse, Package, Ship, Direct to the Consumer Specialist
Server Location | |
Turnkey Internet Inc. New York Albany United States 42.6834, -73.8519 |
The site is programmed for PHP/5.2.16. It has 2 DNS records, ns70.domaincontrol.com, and ns69.domaincontrol.com. It is hosted by Turnkey Internet Inc (New York, Albany,) using Apache/2 web server.
IP: 67.231.240.134
Powered by: PHP/5.2.16
Web Server: Apache/2
Encoding: utf-8
PING (67.231.240.134) 56(84) bytes of data. | |
64 bytes from 67-231-240-134.STATIC.turnkeyinternet.net (67.231.240.134): icmp_seq=1 ttl=53 | 42.8 ms |
64 bytes from 67-231-240-134.STATIC.turnkeyinternet.net (67.231.240.134): icmp_seq=2 ttl=53 | 32.1 ms |
64 bytes from 67-231-240-134.STATIC.turnkeyinternet.net (67.231.240.134): icmp_seq=3 ttl=53 | 32.0 ms |
--- ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 2000ms | |
rtt min/avg/max/mdev = 32.050/35.702/42.894/5.085 ms | |
rtt min/avg/max/mdev = 32.050/35.702/42.894/5.085 ms |
A ping speed test response, is timed at 42.8 ms.
Server Setup | |
Date: | -- |
---|---|
Server: | Apache/2.2.3 (CentOS) |
X-Powered-By: | PHP/5.2.16 |
Set-Cookie: | -- |
Expires: | -- |
Cache-Control: | no-store, no-cache, must-revalidate, post-check=0, pre-check=0 |
Pragma: | no-cache |
Set-Cookie: | -- |
Connection: | close |
Transfer-Encoding: | chunked |
Content-Type: | text/html; charset=UTF-8 |