![](http://www.img-urlm.com/i/jamesadamsprojects.com.jpg)
Jamesadamsprojects.com
Jamesadamsprojects is ranked > 3,000,000 in the United States. 'home : James Adams Projects.'
--Rank in United States
--Worldwide Rank
Monthly pages viewed | < 300 | |
Monthly visits | < 300 | |
Value per visitor | -- | |
Estimated worth | $761.54 | |
External links | 2 | |
Number of pages | -- |
Last Updated: 04/16/2018 . Estimated data, read disclaimer.
www.Jamesadamsprojects.com
LinksServerServer Location | |
American Registry For Internet Numbers Virginia Chantilly United States 38.8963, -77.5216 |
Its 3 nameservers are ns2.dreamhost.com, ns3.dreamhost.com, and ns1.dreamhost.com. American Registry For Internet Numbers (Virginia, Chantilly) is the location of the Apache server. Its IP Number is 69.163.229.220.
IP: 69.163.229.220
Web Server: Apache
Encoding: utf-8
PING www. (69.163.229.220) 56(84) bytes of data. | |
64 bytes from apache2-zoo.accra.dreamhost.com (69.163.229.220): icmp_seq=1 ttl=56 | 39.5 ms |
64 bytes from apache2-zoo.accra.dreamhost.com (69.163.229.220): icmp_seq=2 ttl=56 | 39.5 ms |
64 bytes from apache2-zoo.accra.dreamhost.com (69.163.229.220): icmp_seq=3 ttl=56 | 39.5 ms |
--- www. ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 1999ms | |
rtt min/avg/max/mdev = 39.509/39.542/39.577/0.164 ms | |
rtt min/avg/max/mdev = 39.509/39.542/39.577/0.164 ms |
A time of 39.5 ms, is recorded in a ping test.
Server Setup | |
Date: | -- |
---|---|
Server: | Apache |
Vary: | Accept-Encoding |
Content-Length: | 2821 |
Content-Type: | text/html |