Msprojects.com.au
Msprojects is ranked 32,845,680 in the United States. 'MS Projects - Home.'
32,845,680Rank in United States
--Worldwide Rank
Monthly pages viewed | < 300 | |
Monthly visits | < 300 | |
Value per visitor | -- | |
Estimated worth | $582.38 | |
External links | -- | |
Number of pages | 15 |
Last Updated: 04/15/2018 . Estimated data, read disclaimer.
Content
www.Msprojects.com.au
Topics: Services, Clients, Projects, Current Projects, and Completed Projects.
ServerServer Location | |
Ntt America Inc. Colorado Centennial United States 39.726, -104.801 |
It is hosted by Ntt America Inc (Colorado, Centennial,) using Apache/2 web server. There are 2 Nameservers, ns2.secure.net, and ns1.secure.net. Msprojects.com.au's IP address is 198.106.183.21.
IP: 198.106.183.21
Web Server: Apache/2
Encoding: utf-8
PING (198.106.183.21) 56(84) bytes of data. | |
64 bytes from thedevelopersclub.com (198.106.183.21): icmp_seq=1 ttl=51 | 47.3 ms |
64 bytes from thedevelopersclub.com (198.106.183.21): icmp_seq=2 ttl=51 | 48.5 ms |
64 bytes from thedevelopersclub.com (198.106.183.21): icmp_seq=3 ttl=51 | 46.9 ms |
--- ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 1999ms | |
rtt min/avg/max/mdev = 46.948/47.624/48.558/0.682 ms | |
rtt min/avg/max/mdev = 46.948/47.624/48.558/0.682 ms |
A ping speed test response, is timed at 47.3 ms.
Server Setup | |
Date: | -- |
---|---|
Server: | Apache/2.2.20 (Unix) PHP/5.2.17 with Suhosin-Patch mod_ssl/2.2.20 OpenSSL/1.0.0d mod_apreq2-20051231/2.6.0 mod_perl/2.0.5 Perl/v5.8.9 |
Last-Modified: | -- |
ETag: | "242b815-f60-4a97c14274780" |
Accept-Ranges: | bytes |
Content-Length: | 3936 |
Content-Type: | text/html |