Newmuslimsproject.net
Newmuslimsproject is ranked 5,131,699 in the United States. 'New Muslims Project | Caring for Converts | Islam | Faith | British Muslims | Home.'
5,131,699Rank in United States
317,776Worldwide Rank
Monthly pages viewed | 86,184 | |
Monthly visits | 14,400 | |
Value per visitor | $0.02 | |
Estimated worth | $11,072.53 | |
External links | 1,016 | |
Number of pages | 240 |
Last Updated: 04/15/2018 . Estimated data, read disclaimer.
Visitors
Country | Country Rank | Users % | Pageviews % |
Other countries | 27.70% | 26.80% | |
---|---|---|---|
United Kingdom | 56,216 | 27.20% | 42.30% |
India | 103,538 | 45.10% | 30.90% |
The majority of visitors come from India & United Kingdom.
Traffic History 90 Day Average | ||
Worldwide Rank | 267,039 | 23,341 |
---|---|---|
Daily Visitors | 1,477 | -20% |
Daily Visitors Rank | 237,564 | 38,112 |
Daily Pageviews | 1,951 | +2% |
Daily Pageviews Rank | 426,559 | -24,887 |
Pageviews Per User | 2.00 | +30% |
www.Newmuslimsproject.net
Topics: The New Muslims Project, Caring For Converts, The Pillars, Shahadah - Declaration Of Faith, Where Muslim Life Begins, and Considering Conversion.
Category: 'Supplies/Food' & 'Radio/Regional and Local'
Age: The domain is 15 years and 1 months old.
- Popular pages
- newmuslimsproject.net Caring for Converts | Services | Meeting Point
- newmuslimsproject.net Caring for Converts | Services | Pilgrimage, Umrah and Hajj
- newmuslimsproject.net Caring for Converts | Shahadah | Where Muslim Life Begins
- newmuslimsproject.net Caring for Converts | Hadith | Issues Possibly Affecting New ..
1,615 users visit the site each day, each viewing 2.00 pages.
ServerServer Location | |
Eukhost Ltd England Leeds United Kingdom 53.8, -1.58 |
The programming language environment is PHP/5.2.9. Its 2 nameservers are ns67.eukdns.com, and ns66.eukdns.com. Eukhost Ltd (England, Leeds) is the location of the Apache server.
IP: 213.175.206.48
Powered by: PHP/5.2.9
Web Server: Apache
Encoding: utf-8
PING (213.175.206.48) 56(84) bytes of data. | |
64 bytes from preston.eukhosting.net (213.175.206.48): icmp_seq=1 ttl=55 | 98.1 ms |
64 bytes from preston.eukhosting.net (213.175.206.48): icmp_seq=2 ttl=55 | 97.9 ms |
64 bytes from preston.eukhosting.net (213.175.206.48): icmp_seq=3 ttl=55 | 97.9 ms |
--- ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 2000ms | |
rtt min/avg/max/mdev = 97.967/98.051/98.193/0.100 ms | |
rtt min/avg/max/mdev = 97.967/98.051/98.193/0.100 ms |
The server is faster than 61% of measured websites, at 2794 milliseconds. Also a time of 98.1 ms, is recorded in a ping test.
Server Setup | |
Date: | -- |
---|---|
Server: | Apache |
X-Powered-By: | PHP/5.2.9 |
P3P: | -- |
Expires: | -- |
Cache-Control: | no-store, no-cache, must-revalidate, post-check=0, pre-check=0 |
Pragma: | no-cache |
Set-Cookie: | -- |
Last-Modified: | -- |
Content-Length: | 30127 |
Content-Type: | text/html; charset=utf-8 |