Msprojectresources.blogspot.com
Msprojectresources is ranked 32,845,677 in the United States. 'Microsoft Project Resources blog.'
32,845,677Rank in United States
--Worldwide Rank
Monthly pages viewed | < 300 | |
Monthly visits | < 300 | |
Value per visitor | -- | |
Estimated worth | $589.03 | |
External links | 6 | |
Number of pages | -- |
Last Updated: 04/16/2018 . Estimated data, read disclaimer.
www.Msprojectresources.blogspot.com
ServerServer Location | |
Google Inc. California United States 37.300275, -93.339844 |
Msprojectresources.blogspot.com's server IP number is 72.14.204.132. Google Inc. California is the location of the GSE server.
IP: 72.14.204.132
Web Server: GSE
Encoding: utf-8
PING blogspot.l.google.com (209.85.225.132) 56(84) bytes of data. | |
64 bytes from iy-in-f132.1e100.net (209.85.225.132): icmp_req=1 ttl=53 | 21.8 ms |
64 bytes from iy-in-f132.1e100.net (209.85.225.132): icmp_req=2 ttl=53 | 21.8 ms |
64 bytes from iy-in-f132.1e100.net (209.85.225.132): icmp_req=3 ttl=53 | 22.0 ms |
--- blogspot.l.google.com ping statistics --- | |
3 packets transmitted, 3 received, 0% packet loss, time 2002ms | |
rtt min/avg/max/mdev = 21.803/21.881/22.031/0.200 ms | |
rtt min/avg/max/mdev = 21.803/21.881/22.031/0.200 ms |
A ping to the server is timed at 21.8 ms.
Server Setup | |
Content-Type: | text/html; charset=UTF-8 |
---|---|
Set-Cookie: | -- |
Expires: | -- |
Date: | -- |
Cache-Control: | private, max-age=0 |
Last-Modified: | -- |
ETag: | "fa7135c7-57c2-49b0-b7af-a41a266b0ac5" |
X-Content-Type-Options: | nosniff |
X-XSS-Protection: | 1; mode=block |
Server: | GSE |
Transfer-Encoding: | chunked |